Project Production Management: Flow When You Can — Pull When You Can’t — Stop Pushing (Part 6)

by Hal Macomber | June 18, 2021

(By Hal Macomber with Adam Hoots, Lean Enthusiast Construction ACHE Solutions) In the last four posts, we explored the principles or laws…

Read More

Project Production Management: Bigger Batches Create Longer Projects (Part 5)

by Hal Macomber | June 11, 2021

(By Hal Macomber and Colin Milberg, Principal ASKM Associates) Our common sense tells us the more work we get started then…

Read More

Project Production Management: Bottlenecks Rule — Make it the Policy (Part 3)

by Hal Macomber | May 28, 2021

(By Hal Macomber, EVP Touchplan and Terri Erickson,) All processes and projects have bottlenecks or constraints. A physical bottleneck determines…

Read More

Project Production Management: Beware, Variation Compounds with Dependence! (Part 2)

by Hal Macomber | May 21, 2021

(By Hal Macomber, EVP Touchplan and George Hunt, Lead – Pre-Sales/Sales Engineering Touchplan) Variation is present in things we do…

Read More

Revisiting the Five Big Ideas Transforming the Design and Construction Industry: What Comes After the Five Big Ideas? (Part 10)

by Hal Macomber | April 30, 2021

(Hal Macomber, EVP, Touchplan with George Hunt, Head of Presales / Sales Engineering, Touchplan ) Greg Howell and I proposed…

Read More

Revisiting the Five Big Ideas Transforming the Design and Construction Industry: Adopting the Five Big Ideas on Your CM/GC Projects (Part 9)

by Hal Macomber | April 23, 2021

(Hal Macomber, EVP, Touchplan with Layne Hess, Corporate Director of Planning, Scheduling, and Lean, Jacobsen Construction) We never intended the…

Read More

Revisiting The Five Big Ideas Transforming the Design and Construction Industry: Pursue Project Outcomes at the Intersections of the Five Big Ideas (Part 8)

by Hal Macomber | April 16, 2021

(Hal Macomber, EVP, Touchplan with Calayde Davey, Ph.D., Research Associate, University of Pretoria, South Africa ) So, maybe the five big…

Read More

Revisiting The Five Big Ideas Transforming the Design and Construction Industry: Project Production Thinking Behind the Five Big Ideas (Part 7)

by Hal Macomber | April 2, 2021

(Hal Macomber, EVP, Touchplan with Adam Hoots, Operation Innovation, Langston) The Five Big Ideas Transforming Design and Construction were proposed…

Read More

Revisiting The Five Big Ideas Transforming the Design and Construction Industry: Bring an Outward Mindset to all Interactions (Part 6)

by Hal Macomber | March 26, 2021

(Hal Macomber, EVP, Touchplan with Mark Jussaume, VP, Office Director, SmithGroup) Some of the most important decisions are taken at…

Read More

Revisiting The Five Big Ideas Transforming the Design and Construction Industry: Conduct Construction Projects as a Network of Commitments (Part 5)

by Hal Macomber | March 19, 2021

(Hal Macomber, EVP, Touchplan with Connor Butler, Managing Principal, Relevate) An uninterrupted flow of value-adding work product is within the…

Read More

Revisiting The Five Big Ideas Transforming the Design and Construction Industry: Optimize the Project as a Whole (Part 4)

by Hal Macomber | March 12, 2021

(Hal Macomber, EVP, Touchplan With Jeff Loeb, Project Coach, Lean and Integrated Delivery, Jacobs) People acting from local or workgroup…

Read More

Revisiting The Five Big Ideas Transforming the Design and Construction Industry: Tightly Couple Learning with Action (Part 3)

by Hal Macomber | March 5, 2021

(Hal Macomber, EVP, Touchplan with Terri Erickson, Principal, Kata Consulting The productivity of the design and construction industry has been slowly…

Read More