Technology and the Last Planner® System

Last Planner® System makes your work flow smooth, and saves you both time and money. LPS optimizes your construction process and makes your project more efficient. One way to increase that efficiency even more is by using technology in conjunction with Last Planner®. Implementing Last Planner® System with Touchplan Why should you add technology to […]

Written by Touchplan | October 1, 2015

Last Planner® System makes your work flow smooth, and saves you both time and money. LPS optimizes your construction process and makes your project more efficient. One way to increase that efficiency even more is by using technology in conjunction with Last Planner®.

Screen_Shot_2016-06-21_at_12.02.56_PM.png

Implementing Last Planner® System with Touchplan

Why should you add technology to the Last Planner® System? Get rid of your planning headaches with a better system. Here are all the ways we make your life easier with Touchplan.

Technology and Constraint Logs

Constraints can fall through the cracks if you do not stay on top of checking the constraint log regularly. Here is how Touchplan works to keep you up to date on constraints, and what to do once you are faced with them.

Uncategorized

Touchplan