Touchplan Featured on ConTechCrew!

Michael Carr, President of MOCA’s Software Products Division, Touchplan, joined the ConTechCrew podcast last week to discuss what sparked his interest in engineering and construction, how he was introduced to the Last Planner® System, and what changes he sees coming for construction through Lean methods and technology. Watch the video below, or listen to the […]

Written by Touchplan | October 19, 2018

Michael Carr, President of MOCA’s Software Products Division, Touchplan, joined the ConTechCrew podcast last week to discuss what sparked his interest in engineering and construction, how he was introduced to the Last Planner® System, and what changes he sees coming for construction through Lean methods and technology.

Watch the video below, or listen to the podcast!

 

Construction Technology, Industry News

Touchplan