Touchplan Is at Groundbreak 2018!

The Touchplan team is having a blast this week in Austin, Texas at Procore’s Groundbreak construction technology summit learning about the future of the industry. One thing is clear—it will be driven by the increased availability of data and accessible, intelligent technology. Touchplan is committed to transforming the industry with Lean planning solutions that help construction teams […]

Written by Touchplan | November 15, 2018

The Touchplan team is having a blast this week in Austin, Texas at Procore’s Groundbreak construction technology summit learning about the future of the industry. One thing is clear—it will be driven by the increased availability of data and accessible, intelligent technology. Touchplan is committed to transforming the industry with Lean planning solutions that help construction teams build more with less.

It’s been great to make new industry connections while seeing a lot of familiar faces. Check out our photos from the event!

 

Image from iOS (8)

Amanda McKernan is definitely there.

 

IMG_1495

Booth 107 is ready to go. Look at those socks. 

 

Image from iOS (10)

Our friends from ANDRES! Say, you should read their case study.

 

IMG_1503

Those socks didn’t last long. Better get some at the next conference!

 

Construction Technology, Industry News, Lean Construction

Touchplan

[class^="wpforms-"]
[class^="wpforms-"]
[class^="wpforms-"]
[class^="wpforms-"]