The Harlo, 1350 Boylston Street, Boston, MA

About this Touchplan Project

General Contractor: Skanska USA Building

Type: Residential

Square Feet: 183,000

Project Summary

1350 Boylston Street, Fenway, Boston, MA

New 17-story mixed-use building featuring 212 luxurious apartment residences and approximately 7,000 square feet of ground-floor retail space with premium dining options including Tatte Bakery, Oath Pizza and Cava Mediterranean Grill. Residences at The Harlo range from studios to three-bedrooms and feature elegant finishes including exposed concrete ceilings; quartz countertops; hardwood floors; oversized windows; and panoramic views of Fenway Park, the Charles River, and Downtown Boston. Select residences feature loft floor plans, as well as private terraces.

The Harlo features modern amenities including a lounge with a billiards area and open workspaces; a work and study area; private dining and entertainment space; a fitness center; a library; and conference space. Multiple private outdoor spaces are located at The Harlo, including a yoga terrace; a fifth-floor outdoor terrace featuring cabanas, a fire pit, and grills; and a top-level sky deck with sweeping views of the Emerald Necklace, the Boston skyline, and Fenway Park.

A two-level underground parking garage is located at The Harlo with car charging stations and spaces for 105 cars, in addition to bicycle storage. The Harlo is built to LEED Gold efficiency standards.

Ready to get in touch?

Whether you have a question about features, demos, pricing or anything else, we’re here to help.
If you are logging into a project, do so here.
By submitting this form, I agree to the Terms of Use and the use
of my personal information as described in the Privacy Policy.