Featured Projects

Touchplan is a construction management tech company, here to develop approachable and innovative technology solutions that make the construction process more collaborative, transparent and predictable for all stakeholders involved.

Life Time Center at Chestnut Hill, Newton, MA

286,000-square-foot wellness-oriented office and retail building prominently located on Route 9 in Chestnut Hill. Now open and 100%-leased, Life Time Center is anchored by Life Time Fitness, who has opened a 129,000-square-foot club, Life Time Athletic Chestnut Hill. Additionally, Dana-Farber Cancer Institute has leased 140,000 square feet, and Newton-Wellesley Hospital has leased 6,185 square feet. […]

Read More

Innovation Point at Fort Point, 5-6 Necco Court, Boston, MA

General Electric will build Innovation Point, its new headquarters facility, on an approximately 2.5-acre parcel located on Fort Point Channel in Boston’s Fort Point neighborhood. The parcel consists of two historic six-story brick Boston Wharf Company warehouse buildings at 5 and 6 Necco Court and a section of the existing Gillette parking lot. Designed by […]

Read More

Suffolk Construction Expansion, 65 Allerton Street, Roxbury, MA

Completed expansion of construction manager Suffolk Construction’s existing headquarters facility by 38,000 square feet with new office and amenity space. Amenities include an auditorium, collaborative workspace, a new cafeteria, a salon, a massage room, a fitness and wellness center, new conference rooms, a ground-floor outdoor patio and a second-floor outdoor terrace. A new Smart Lab […]

Read More

Nantucket Cottage Hospital, Nantucket, MA

The Nantucket Cottage Hospital community came together on July 1st for a groundbreaking ceremony for the island’s new hospital. The building site is in the shadow of the current 1957 hospital, which will remain operational during construction. The new two-story, 106,000-square-foot facility will include an expanded emergency department, increasing in size from 4,400 square feet […]

Read More

The Commons at Providence Station, 80 Smith Street, Providence, RI

New six-story building featuring 169 apartment residences located along the Moshassuck River in Downtown Providence, steps to the Providence, RI commuter rail station with direct train service to Boston. The Rhode Island State House is located across from the Commons at Providence Station site. Apartments at The Commons at Providence Station will include one- and […]

Read More

The Graphic, 32 Cambridge Street, Charlestown, MA

Upcoming renovation of the existing Graphic Arts Building located in Sullivan Square steps to the MBTA Orange Line, and construction of a new four-story modular building on site. A total of approximately 171 residential apartments will be built at 32 Cambridge Street, including 46 apartments in the Graphic Arts Building and 125 in the new-construction […]

Read More

The Benjamin & VIA, Seaport District, Boston, MA

The Benjamin & VIA encompass Boston’s largest mixed-use project in over 30 years, spanning 1.5 million residential and retail square feet over three acres of land. Located in the heart of the Seaport District, The Benjamin (22 stories tall) and VIA (20 stories tall) are built to the highest standard of modern luxury and feature […]

Read More

100 Binney Street, Kendall Square, Cambridge, MA

Fully leased 431,500 rentable square foot (RSF) Class A lab and office building opening fall 2017 targeting a minimum of LEED Platinum sustainability certification. A stunning glass facade with landscaped balconies will allow for abundant natural lighting. 100 Binney’s dual core, 40,000 RSF floor plates will provide flexible workspace design capability. Global biopharmaceutical company Bristol-Myers […]

Read More

Two Brookline Place at Brookline Village, Brookline, MA

Upcoming eight-story, 182,500-square-foot building (Two Brookline Place) and six-story, 47,000-square-foot addition to the existing six-story One Brookline Place medical building. One Brookline Place will remain occupied throughout construction. The new Two Brookline Place will feature a medical office and ambulatory care space on upper floors with retail along the ground floor. The Brookline Place Redevelopment […]

Read More

Wentworth Multipurpose Academic Building, 555 Parker Street, Mission Hill, Boston, MA

Wentworth Institute of Technology’s new four-story Multipurpose Academic (MpA) Building will feature approximately 78,000 square feet of academic space to accommodate an expansion of the school’s engineering, science and innovation programs. The building will feature state-of-the-art equipment and technical lab space with an open layout of learning and collaborative spaces. The first floor will consist […]

Read More

One Dalton Street, Back Bay, Boston, MA

One Dalton will be the tallest residential tower in New England at 740 feet and 61 stories tall and will consist of 712,500 square feet of residential, hotel and retail space. One Dalton’s upper floors will contain 180 private luxury condominium residences. Underneath will be a Four Seasons luxury hotel with 215 rooms. On One […]

Read More

Aventura ParkSquare, 2950 NE 207th Street, Aventura, FL

Located on 7.4 acres, this is a mixed-use development. Planned are 131 luxury residential units, Class-A office space plus a parking garage and a 40,000-square-foot wellness center. An additional 50,000 square feet of retail space will be housed on the ground floor of both the office building and wellness center.

Read More
1 2 3 4

Ready to get in touch?

Whether you have a question about features, demos, pricing or anything else, we’re here to help.
If you are logging into a project, do so here.
By submitting this form, I agree to the Terms of Use and the use
of my personal information as described in the Privacy Policy.