Case Studies
We are dedicated to making the entire construction process more collaborative, transparent and predictable for all stakeholders involved. See how our construction planning software has improved project certainty for customers all over the world.

Touchplan® for Turner–Yates’ Battery Manufacturing Facility: A Scalable System for Lean Planning and Execution
Phase 2 of the Turner–Yates battery manufacturing megaproject shows how Lean planning can scale. By implementing Touchplan and standardizing workflows, the team reduced planning time, improved coordination, and aligned more than 40 trade partners under a single system.

Planning World-Class Facilities for Future Research: How CDI’s Lean Champions Delivered the I³R Center
The I³R Center pushed CDI Contractors to adopt Lean practices and digital planning to manage one of their most complex projects to date. Using Touchplan, the team navigated tight logistics, supported extensive prefabrication, and built a high-performing culture of collaboration and continuous improvement.

Construction Leaders on How Touchplan Makes Work Easier
Three construction leaders share how Touchplan has transformed their approach to planning from real-time collaboration and simplified pull planning to greater visibility and ownership on the jobsite. Learn how digital planning with Touchplan leads to more accurate schedules, fewer delays, and better project outcomes.

From Skeptic to Champion: Leading Willmeng’s Shift to Digital Collaborative Planning
A former skeptic shares how Touchplan transformed planning at Wilming, replacing pull boards with real-time collaboration and greater schedule clarity.

Precision Planning in Design-Build: EllisDon’s Innovative Approach
EllisDon adopted Touchplan as its digital planning solution across all projects to strengthen collaboration and execution. On the complex, remote Thunder Bay Correctional Complex, the team replaced traditional push planning with real-time, collaborative pull planning.

Blueprint for Success: W.T. Rich’s Successful Roll-Out of Digital Lean at Hunnewell Elementary School
W.T. Rich used Touchplan to digitize Lean planning on the Hunnewell Elementary School project, replacing sticky notes with real-time collaboration and data-driven coordination. The result was a fully executed schedule, reduced downtime, and an on-time delivery—setting a new standard for future public sector builds.

1111 Church Apartments: Yates’ Collaborative Planning Success
Yates Construction used Touchplan to plan, coordinate, and repeat workflows on a complex mixed-use residential project in Nashville, enabling real-time collaboration across all trades. The result: improved accountability, streamlined tower sequencing, and delivery 35 days ahead of schedule.

Labor Flow Optimization – Balfour Beatty’s Approach to Managing the Skilled Labor Shortage
Balfour Beatty is using Touchplan and Lean practices to optimize labor flow, reduce trade stacking, and mitigate schedule risks caused by supply chain disruptions. The result is safer jobsites, smoother project execution, and significantly less stress for field teams—all while improving productivity across complex builds.

Constructing Utah’s Tallest Building – A Master Class in Precision Construction Planning
By synchronizing the Critical Path Method with the Last Planner System through Touchplan and P6, Jacobsen Construction successfully navigated the complexities of constructing the tallest building in Utah with remarkable efficiency, delivering a landmark structure that redefines upscale urban living.

Building Life Saving Facilities
BOLDT uses the Touchplan collaborative planning platform for children’s hospital construction.

Construction Accelerator & Touchplan A 1-2 Punch for Project Success
Kinetic has been deploying the Last Planner System®, using the Construction Accelerator/ Touchplan combination on a series of multi-million-dollar projects.

Keeping Up with Demand in Data Center Construction: A Leader’s Story
Brasfield & Gorrie selected Touchplan as their primary planning software for a greenfield data center megaproject.