Search Touchplan website:
rendering of Wynn Hotel and Casino

About this Touchplan Project

Client: Suffolk Construction

Type: Hospitality - Hotel/Resort/Casino

Size: 3,000,000 SF

Project Summary

1 Horizon Way, Everett, MA

Encore Boston Harbor is a 34-acre, 3-million-square-foot, five-star casino along the Mystic River in Everett. Encore Boston Harbor features a 210,000-square-foot gaming facility with approximately 3,200 slot machines and 160 gaming tables. A 24-story, 350-foot tall curved glass tower contains over 600 luxury hotel rooms with a standard room size of over 600 square feet.

A 24/7 public waterfront park, including a boat dock with sweeping views of the Boston skyline, was constructed along the Mystic River. Encore Boston Harbor also includes retail and restaurant space as well as a spa and health club. A three-level underground garage has parking for approximately 3,000 cars