Search Touchplan website:
Suffolk constructed a 650-foot-tall residential tower

About this Touchplan Project

Client: Suffolk Construction

Type: Residential

Size: 1,047,607 SF

Project Summary

16901 Collins Ave, Sunny Isles Beach, FL

Suffolk used the Touchplan planning platform to construct Jade Signature, a 650-foot-tall residential tower on Sunny Isles Beach. With 55 floors and 192 condominium units, this is the largest residential building on Sunny Isles Beach. The building’s striking design features continuous balconies and glass to provide incredible views in every direction.