Encore Boston Harbor, One Broadway, Everett, MA

About this Touchplan Project

General Contractor: Suffolk Construction

Type: Residential

Square Feet: 3,000,000

Project Summary

1 Horizon Way, Everett, MA

Encore Boston Harbor is a 34-acre, 3-million-square-foot, five-star casino opening June 2019 along the Mystic River in Everett. Encore Boston Harbor will feature a 210,000 square foot gaming facility with approximately 3,200 slot machines and 160 gaming tables. A 24-story, 350-foot tall curved glass tower will contain over 600 luxury hotel rooms with a standard room size of over 600 square feet.

A 24/7 public waterfront park, including a boat dock, with sweeping views of the Boston skyline, will be constructed along the Mystic River. Encore Boston Harbor will also include retail and restaurant space as well as a spa and health club. A three-level underground garage will be built on-site with parking for approximately 3,000 cars

Ready to get in touch?

Whether you have a question about features, demos, pricing or anything else, we’re here to help.
If you are logging into a project, do so here.
By submitting this form, I agree to the Terms of Use and the use
of my personal information as described in the Privacy Policy.