This 200-room addition to the Virgin Hotels brand features an eye-catching, lace-like exterior design and an emphasis on sustainability, with LEED certification likely. The hotel features a gym, spa, pool, rooftop bar, meeting spaces, and a ballroom, among other amenities.
Virgin Hotel, 1923 Hi Line Drive, Design District, Dallas, TX

About this Touchplan Project
General Contractor: ANDRES Construction Services
Type: Hotel
Square Feet: 32,067
Project Summary
1923 Hi Line Drive, Design District, Dallas, TX