Touchplan Introduces Ticket Export
01/25/2023
The latest product feature allows users to export data from Touchplan directly into P6.
BOSTON, MA – 1/25/23 – (FOR IMMEDIATE RELEASE) – Touchplan, an award-winning collaborative construction planning software platform that helps make construction project outcomes more predictable and profitable, has announced a new ticket export capability.
The feature makes the hassle of moving tickets to P6 much easier, allowing users to update their P6 schedule based on changes made in Touchplan.
Ticket Export saves time by exporting data from Touchplan directly into P6 as often as the user desires. The entire project in Touchplan can now be exported and used to update P6. Users can also export pieces of the Touchplan schedule into P6 to continue to build upon the Master Schedule.
Touchplan’s innovative daily planning and analytics platform is trusted by more than 59,000 design and construction professionals worldwide. More than 4,600 project teams have used Touchplan successfully to optimize the delivery of more than $93.4 billion in construction.
“This new feature, along with our upcoming P6 Import upgrade, will dramatically reduce time spent aggregating, analyzing, and reporting on plan updates and provides a more seamless construction process,” said Touchplan Product Lead Daniel Quaroni.
###
About Touchplan
Touchplan is a cloud-based, real-time software platform for intelligent construction planning. Touchplan enables general contractor and specialty contractor collaboration to prevent schedule and budget slippage and enhance jobsite safety. It also provides owners with the instant insights they need to track progress and anticipate problems on projects of varying size and type. Using Touchplan reduces delays, mitigates risks, and improves operational efficiency, which results in more profitable projects. Touchplan is the software division of privately held MOCA Systems, Inc. To learn more, visit touchplan.io.
Media contact, for Touchplan
David Finnegan
617-861-5485
Read more